Skip to main content
Drilling operations
- Drilling vertical wells up to 2000M NQ, 1350 M HQ;
- Hydrogeological work;
- Injections into individual well intervals;
- Experimental single pumping, lasting from one day to 5 days;
- Pumping water during flow-measurement of wells in static and dynamic conditions;
- Water sample analysis;
- Installation in wells KVP (cable vibration piezometer).
Geophysical works. Logging is carried out by methods
- Flowmetry;
- Inclinometry;
- Cavernometry;
- Optical logging (for the dry part of the well acoustic televiewers (OTV/ATV);
- Laboratory work;
- Determination of uniaxial compressive strength in the natural state;
- The same, in the water-saturated state;
- The same for uniaxial tension;
- Triaxial tests;
- Direct shear tests.
Definition:
- Conditional linkage in the pattern. With t/m2;
- The angle of internal friction, f. deg;
- Soil density, p. g/cm3;
- Moisture of natural soil. We, d.e.; Porosity coefficient e de;
- Strength of e wateras, kgf/cm2;
- Tensile strength , kgf/cm2;
- Volumetric weight (density) in. g/cm3;
- Skeleton specific weight , d, g/cm3;
- Porosity, p. %;
- Fracturing intensity. w. M-1;
- Lithological description of wells with engineering geological elements (EGE);
- Geotechnical description of the core according to the classification of D. Lobshir and Belyavsky.